Do you still need help with this question?
It's both. Look at the gradients between one point then the one after it. It stays constant from one to the next. (Gradient is 2 by the way: (5-3)/(2-1))
The answer is -7, please give brainliest.
One JOB = 1 and 2 hours = 120 min
Tyler Rate per minute: 1/120 (in 1 minute he performes 1/120 of the job)
Dakota<span> Rate per minute: 1/90 (in 1 minute he performes 1/90 of the job)
Tyler's + Dakota's rate per 1 minute = 1/120 + 1/90 = 7/360 (Job/minutes)
7/360 of the job was performed in 1 minute
</span>a complete JOB =1 to be performed in x minutes (Rule of three)
x = 1x1/(7/360) that equals to 360/7 and x (time of both) = 51 min 42