It’s hard but I think you can do it try your best!
The answer for this question is A. True.
I hope that this helped!
Ok. <span>well the answer 1/2 the hour you paint 1/2 in 1/4 so add 1/2+1/2=1 so it is 2 so 1/4+1/4 </span>
Answer:
so the answer will be 1
Step-by-step explanation:
An oil tanker can be emptied by the main pump in 5 hours.
An auxilary pump can empty the tanker in 14 hours.
If the main pump is started at 7pm, when should the auxilary pump be started
so that the tanker is emptied by 11pm?
:
Let t = no. of hrs to run the Aux pump
:
The main pump will run 4 hr (7 - 11 pm)
:
Let the completed job = 1; (an empty Tanker)
:
The shared work equation
4%2F5 + t%2F14 = 1
Multiply equation by 70 to get rid of the equation, results:
14(4) + 5t = 70
56 + 5t = 70
5t = 70 - 56
5t = 14
t = 14%2F5
t = 2.8 hrs to run the aux pump
:
2.8 hr = 2 + .8(60) = 2 hrs 48 min
:
Subtract 2:48 from 11:00 = 8:12 PM start the aux pump
;
;
Check solution
4/5 + 2.8/14 =
.8 + .2 = 1
Answer:
where should I substitute 8 for x? if its like this 4(8)+y=12 than its y=-20
Step-by-step explanation: