The estimate is 57.6 %
<em><u>Solution:</u></em>
Given that, On percent error, 48% is the actual and the error rate is 20%
To find: Estimate
Percent error is the difference between a measured and known value, divided by the known value, multiplied by 100%
<em><u>The formula for percent error is given as:</u></em>

Here given that,
percent error = 20 %
Actual = 48 %
Estimate = ?
Let "x" be the estimate
Substituting the values we get,

Thus the estimate is 57.6 %
I’m trying to get points so I’m not answering this
The answer is either: (im making you choose)
-100
or
100
You multiply -10 by itself to get the correct answer
Dont forget about the signs
Answer: (0.5496, 0.5754)
Step-by-step explanation:
The confidence interval for population proportion (p) is given by :-
, where
= Sample proportion , n= sample size , z*= Critical z-value.
Let p be the proportion of all college students who are in favor of banning Hawaiian shirt.
Given, A random sample of 4000 college students yielded 2250 who are in favor of banning Hawaiian shirts.
i.e. n=4000

z-value for 90% confidence level is 1.645
Now , 90% confidence interval for p would be :


Hence, the required 90% interval = (0.5496, 0.5754)
This is the concept of linear proportionality;
We are required to find the height of the tower in feet. The height of the tower will be found as follows;
[height of tower]/[length of the shadow of tower]=[height of post]/[length of shadow of the post]
height of the tower =h
height of the shadow=100ft
height of post=4 ft 6in=4 1/2 ft= 9/2 ft
length of the post's shadow=3 ft 4 in 3 1/3 ft=10/3 ft
N/B 1 ft= 12 inches
thus;
h/100=(9/2)/(10/3)
multiplying both sides by 100 we get:
h=(9/2)/(10/3)*100
h=9/2*3/10*100
h=135 ft
the answer is 135 ft