The answer to the first one is ' D '.
(All the angles inside a triangle have to add up to exactly 180 degrees.)
The answer to the second one is ' C ' .
(If two sides are equal, then the sides opposite them are also equal.)
Tom--------------
>10 sq ft per minute
Tim-------------------
>3.5*10=35 sq ft per minute
Both painters (10+35)=45
sq ft per minute
let's assume a cubic unit crate----------> V1=1*1*1=1 feet3
<span>the total surface of the cube is S1=6*(1*1)=6 </span>sq
ft
if the volume of the cube increases twice
V2=2 feet3 ------------------- > 2=x*x*x------------- >x=2^(1/3)
And the S2=6*(2^(1/3)*<span> 2</span>^(1/3)=9.5244 sq ft
V2/V1=9.5244/6=1.5874
Therefore
If Tim and Tom-----------------------
> take 1 day----------- > to paint a crate V1
For the crate V2------------- > take 1.5874 days
assuming an 8-hour work day
0.5874*8=4.70 hr-------------- > 4 h 42 min
The answer is 1 day 4h 42 min
Answer:
-30bc + 50bd
Step-by-step explanation:
3a + 5b/3c - 5d = 3a - 5b/3c - 5d
(3c - 5d)(3a - 5b) = (3a + 5b)(3c - 5d)
9ca - 15bc - 15da + 25db = 9ac - 15ad + 15bc - 25bd
9ca -15bc - 15da + 25db - 9ac + 15ad - 15bc + 25bd
9ca and -9ac and -15da and 15ad cancel each other out, so
-30bc + 50db is left
Answer:
distributivity/distributive property