Answer:
C.
Step-by-step explanation:
1 -3
2 -5
3 -7
4 -9
Because it has a constant slope it is increasing x by 1 and decreasing y by -2.
Slope: -2/1 or -2x
Answer: It will take the largest pipe 5.5 hours to fill the swimming pool alone.
It will take the smallest pipe 16.5 hrs to fill the swimming pool alone.
It will take the other pipe 11 hours to fill the pool alone.
Step-by-step explanation: let time needed to fill the swimming pool by the largest pipe be x ... eq (1)
Let time needed to fill the swimming pool by the smallest pipe be 3x ... eq(2)
Let time needed to fill the swimming pool by the other pipe be 2x ...eq(3)
The job to be done (to fill a swimming pool) be 3/x +3/3x+3/2x=1 ... eq(4)
Multiply 6x on both sides you will get:
6(3)+2(3)+3(3)=6x
18+6+9=6x
33=6x
33/6=x
X=5.5hours
Substitute x=5.5 into EQ 2 and 3
3x=3×5.5=16.5hours
2x=2×5.5=11hours
Check: substitute the value of x into eq3/5.5+3/16.5+3/11
0.545+0.182+0.273=0.9997=1
Answer:
Comparison of Numbers is the process that defines the similar properties between two numbers and identifies the number that is greater than, smaller than, or equals to another number. There are some basic rules of comparison in Mathematics; they are greater than (>), less than (<), or equal sign (=).