


with that template in mind, let's see, it went to the right 2 units, and then up 3 units.
that simply means, C = -2, D = 3.
50 meters per second
3600 seconds per hour
1000 meters per km
50/1000 = 0.05
1/3600 = .0002777
0.05/0.0002777 = 180km per hour
180*4 = 720km in 4 hours
"Two significant figures" means that a digit after the second one could actually be anything ... it wasn't measured. 'X' could be anything from 230 to 239. 'Y' could be anything from 400 to 409.
The greatest possible value of that fraction is. (239)/(409 squared) .
Answer:
32 cars
Step-by-step explanation:
we know that he can paint 12 cars in 3 weeks.
that means that he can paint 4 cars per week.
4cars x 8weeks = 32 cars in 8 weeks
Answer:
In order to calculate the expected value we can use the following formula:
And if we use the values obtained we got:
Step-by-step explanation:
Let X the random variable that represent the number of admisions at the universit, and we have this probability distribution given:
X 1060 1400 1620
P(X) 0.5 0.1 0.4
In statistics and probability analysis, the expected value "is calculated by multiplying each of the possible outcomes by the likelihood each outcome will occur and then summing all of those values".
The variance of a random variable Var(X) is the expected value of the squared deviation from the mean of X, E(X).
And the standard deviation of a random variable X is just the square root of the variance.
In order to calculate the expected value we can use the following formula:
And if we use the values obtained we got: