I acidently removed the stuff but anyways the answer is 12:27 or 12 to 27
do 12 + 15 = 27, and so 12 to 27 :)
Answer:
Choice C:
Step-by-step explanation:
To find your slope do:
that's how you get 1/2
4 is just the y-int.
Answer:
Due to the higher Z-score, Demetria should be offered the job.
Step-by-step explanation:
Z-score:
In a set with mean and standard deviation , the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
In this question:
Whichever applicant had grade with the highest z-score should be offered the job.
Demetria got a score of 85.1; this version has a mean of 61.1 and a standard deviation of 12.
For Demetria, we have . So
Vincent got a score of 299.2; this version has a mean of 264 and a standard deviation of 22.
For Vincent, we have .
Tobias got a score of 7.26; this version has a mean of 7.1 and a standard deviation of 0.4.
For Tobias, we have .
Due to the higher Z-score, Demetria should be offered the job.
Answer:
36
Step-by-step explanation:
If its the khan question 3x4x3
The answer to that is 2/5