The minimum cost is the y-coordinate of the vertex of the parabola represented by the equation. The x-coordinate is the number of bats.

60 bats should be produced every day to keep costs at a minimum.
(5.8f - 3g + g) - (7f - 2.5g)
(5.8f - 4g) - (7f - 2.5g)
2.8f - 2.5g
Answer:
2.8f - 2.5g
Answer:
$65.34
Step-by-step explanation:
Multiply $55 by 0.08. Then multiply $55 by 0.1. Then add the two.