Answer:
A=4000, B=80, C=24
Step-by-step explanation:
You forgot to put the correct area model, I attached it to the answer.
We have the fact that Mountain Q is 4 times the height of Mountain P. That's the "4" we have in the left side of our model. It's like having a multiplication table, next to the "4" we have "A" and upper this we have "1000", the only thing we have to do is multiplify 4*1000=4000. The next letter we have is B and below it we have "320", we divided it by 4, 320/4=80. The last letter we have is C, and is below a "6", we only have to multiplify it by 4, 6*4=24.
At the end we only sum our
- A + 320 + c = 4344 (4 times the height of Mountain P).
- 1000 + B + 6 = 1086(the height of the Mountain P).
Answer:
3
Step-by-step explanation:
It's given that ΔDEF ∼ΔXYZ . So the corresponding sides of both triangles will be proportional to each other.

DE = 4 ; XY = 4(n + 1) ; EF = 5 ; YZ = 7n - 1
Putting all these values gives ,







Answer: (5,3)
Step-by-step explanation:
the formula used for a reflection across the x-axis is (x,-y)
Part A) 24.79 acres
1) Since that plot has an area of

And the number of units must be between 10 and 10² units.
Part A)

2) Let's convert them to the apparently plausible units, see if it fits within the given interval.

We can see that 0.03 m² does not belong to the given interval.
3) Hence, the answer is 24.79 acres.
Answer:
45
Step-by-step explanation:
The 4 part of the ratio represents Pip's 20 sweets
Dividing 20 by 4 gives the value of one part of the ratio
20 ÷ 4 = 5 sweets ← value of 1 part of the ratio
Thus
Pip gets 20 sweets
Angad gets 20 sweets ( 4 parts of the ratio )
Nick gets 5 sweets ( 1 part of the ratio )
Total number of sweets = 20 + 20 + 5 = 45