The line Y = 1 is a horizontal line; its slope is zero.
A line perpendicular to Y = 1 is a vertical line.
Its slope is undefined.
(This does NOT mean that it's infinite, or anything else.
The slope of a vertical line is undefined. It doesn't have
a name or a symbol. It's nothing.)
Answer:
B. z Subscript alpha divided by 2 zα/2 = 1.96.
Step-by-step explanation:
We are given that we want to construct a confidence interval. For this, the summary statistics for randomly selected weights of newborn girls:
n = 236,
= 30.3 hg, s = 7.2 hg. The confidence level is 95%.
As we can clearly see here that the population standard deviation is unknown and the sample size is also very large.
It has been stated that when the population standard deviation is unknown, we should use t-distribution but since the sample size is very large so we can use z distribution also as it is stated that at very large samples; the t-distribution corresponds to the z-distribution.
Here,
= level of significance = 1 - 0.95 = 0.05 or 5%
= 0.025 or 2.5%
So, the value of
in the z table is given as 1.96 with a 2.5% level of significance.
Well, first fin dyour best estimate mine is...600
Then after you got your best estimate divide that my 20
600/20 = 30
Hope this helped :D
Answer:
-2
Step-by-step explanation:
To solve you need to replace the variables with their numbers.
3(-1) - (-1^2)
-1 x -1 = -1
3 x (-1) = -3
-3 - (-1) =
-2