AGB and DGE are acute angles so DGE= 30°. EGF is 100° (50+30+100 {in that order}) (idk the rest
Answer:
B 5400
Step-by-step explanation:
Line SW is perpendicular to line RS, but not to line TV
Answer:
Where
and 
We are interested on this probability

And the best way to solve this problem is using the normal standard distribution and the z score given by:

If we apply this formula to our probability we got this:
And we can find this probability using the complement rule:

Step-by-step explanation:
Previous concepts
Normal distribution, is a "probability distribution that is symmetric about the mean, showing that data near the mean are more frequent in occurrence than data far from the mean".
The Z-score is "a numerical measurement used in statistics of a value's relationship to the mean (average) of a group of values, measured in terms of standard deviations from the mean".
Solution to the problem
Let X the random variable that represent the variable of interest of a population, and for this case we know the distribution for X is given by:
Where
and 
We are interested on this probability

And the best way to solve this problem is using the normal standard distribution and the z score given by:

If we apply this formula to our probability we got this:
And we can find this probability using the complement rule:

Answer:
A. The area of the park is 251015.62 m squared.
B. The sod would cost $313769.52
C. The perimeter of the border is 1927.5 m
D. The cost fo the paving stone is going to be $5300.625
E. The total cost for the sod and pacing stone combined is $31139070.14
HOPE THIS HELPS I WOULD APPRECIATE BRAINLIEST IF POSSIBLE :)