Answer:
a. 255.255.255.0 (class C)
b. 255.255.255.224
Explanation:
Here, we want to give the implied subnet mask of the given classful IPV4 address
We proceed as follows;
Given IPv4 address: 200.200.200.200
Classes
Class A : 0.0.0.0 to 127.255.255.255
Class B: 128.0.0.0 to 191.255.255.255
Class C: 192.0.0.0 to 223.255.255.255
Class D: 224.0.0.0 to 239.255.255.255
so 200.200.200.200 belongs to Class C and it's subnet mask is 255.255.255.0
In CIDR(Classless Inter Domain Routing)
subnet /27 bits means 27 1s and 5 0s. so subnet
i.e 11111111.11111111.11111111.11100000 which in dotted decimal format is 255.255.255.224 .
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.
....field while a row represents a record
In order to conserve the angular momentum, Angular speed (w) often increases. The 'none of the above' option has global CSS rulesets of an angular 8 project mcq.
- The angular momentum of a rigid object is known as the product of the moment of inertia and the angular velocity.
Angular speed is described as how quickly an object rotates. it is seen as the change in the angle of the object per unit of time.
See full question below
What has global CSS rulesets of an angular 8 project mcq.
A. e2e
B. None of the above
C. App
D. node_modules
Learn more from
brainly.com/question/24336703
Answer:
1/2000
Explanation:
import java.util.Scanner;
public class InputExample {
public static void main(String [] args) {
Scanner scnr = new Scanner(System.in);
System.out.print("Enter birth month and date:");//comment this line if not needed
int birthMonth=scnr.nextInt();
int birthYear=scnr.nextInt();
String output= birthMonth+"/"+birthYear+"\n";
System.out.println(output);
}
}
if using this code the out put should be 1/2000