Answer:
C
Step-by-step explanation:
<em>B: 2X + 12 > 3</em>
2x > -9
x> -9/2
<em>C: 2X - 5 > 7</em>
2x > 12
x > 6
<em>D: 2x - 6 > 24</em>
2x > 30
x > 15
Hope this helps ^-^
Cost per meter(C) = $60/m
Length of rectangular field(L) = 50m
L = 2W
-> W = L/2
-> W = 50/2
-> Width of rectangular field = 25m
Cost of one field length(l) = L x C
-> l = 50 x 60
-> l = $3000
Two of the lengths of the field = 2 x l
-> 2 x $3000
-> $6000
Cost of one field width(w) = W x C
-> w = 25 x 60
-> w = $1500
Two of the widths of the field = 2 x w
-> 2 x $1500
-> $3000
Cost of fencing entire field = $6000+$3000
Hence, total field cost = $9000
Answer:
1) 20% change I think its an increase.
If needed I could try to answer the 2nd question but I am sure that I got the first one right.
Step-by-step explanation:
Your answer is the last one!