Answer:
Step-by-step explanation:
Answer:
The costs of the plan are $0.15 per minute and a monthly fee of $39
Step-by-step explanation:
Let
x ----> the number of minutes used
y ----> is the total cost
step 1
Find the slope of the linear equation
The formula to calculate the slope between two points is equal to

we have the ordered pairs
(100,54) and (660, 138)
substitute


step 2
Find the equation of the line in point slope form

we have

substitute

step 3
Convert to slope intercept form
Isolate the variable y

therefore
The costs of the plan are $0.15 per minute and a monthly fee of $39
Answer:
21. y = 75000·0.935^t
22. after 74.6 days
23. y = 27.8112·1.18832^t
24. 18.8% per month
25. 1748
Step-by-step explanation:
22. It is convenient to use the graphing calculator to solve this problem. The number of days is where the exponential curve has the value 500. It is about 74.55 days. (see the first attachment)
__
23. y = 27.8112·1.18832^t (see the second attachment)
__
24. The rate of change is the difference between the base of the exponential and 1, often expressed as a percentage. The time period is the units of t.
(1.18832 -1) × 100% ≈ 18.8% . . . . per month
__
25. Evaluating the function for t=24 gives y ≈ 1748.30425259 ≈ 1748.
_____
<em>Comment on graphing calculator</em>
A graphing calculator can make very short work of problems like these. It is worthwhile to get to know how to use one well.
Each side is 13cm
the square root of 169 is 13
Answer:

Step-by-step explanation:
The formula for the future value (FV) of an investment earning compound interest is

where
PV = the present value (PV) of the money invested
r = the annual interest rate expressed as a decimal fraction
t = the time in years
n = the number of compounding periods per year
Data:
FV = $7100
r = 8 % = 0.08
t = 7 yr
n = 2
Calculation:
