The answer would be 3.33333. I think because 10*15= 150. Then you would divide it by 45 and you would get 3.333. If you get it wrong im sorry.
Answer:
the second one +1.5 m/s
Step-by-step explanation:
to find the velocity you need to find the slope of the two points then just put it into the time (s) and position (m) terms which equals +1.5 m/s
250 lunches are produced by the small business in last week.
<u>Step-by-step explanation:</u>
It is given that,
- y ⇒ the average cost per week.
- x ⇒ the number of lunches produced per week.
The function relating these two factors x and y is given as y = 2.1x + 75
- The cost of the last week is y = $600.
- The lunches made last week is x = unknown.
<u>To find the value of x :</u>
Substitute y= 600 in the given function,
⇒ 600 = 2.1x + 75
⇒ 2.1x = 600 - 75
⇒ x = 525 / 2.1
⇒ x = 250
Therefore, the lunches prepared last week is 250.
Answer:
P=8h
Step-by-step explanation:
P is the total amount of dollars that Keith will make, while h is the number of hours he will work for. If you multiply the number of hours he works for and how much he makes in an hour which is 8. You will get the total amount.