The square root of 4 is 2 because 2•2 is 4
So
lets say we have
a/b=2a/2b
we know that if we invert one and multiply it by the other (divide them), we get 1 because a/a=1 where a=a
so
2/3 and 4/6 are equivelent because if you divide them we get 12/12=1
2/3 and 8/12 are equivilent because if you divide them we get 24/24=1
and sinde 2/3=4/6 and 2/3=8/12, 2/3=4/6=8/12
they are equivlent
The Municipality we be able to set up 597 street name boards with R2 left in the budget.
Data;
- Amount Budgeted = R80,000
- Cost of each board = R134
<h3>Number of Street Boards in the Budget</h3>
The number of streets boards that can be produced in the budget is calculated by dividing the total amount budgeted by the cost of each street board. This is done mathematically as

We would have a total of 597 street names on the budget with some amount left.
We can calculated this by multiplying 597 by 134 and then subtracting the value from R80,000

The Municipality we be able to set up 597 street name boards with R2 left in the budget.
Learn more on division of numbers here;
brainly.com/question/20301788
Since the vertex is at (-3, 6), the equation is given by
y = a(x + 3) + 6
Therefore, option A is the correct answer.
How much part can sally paint in an hour ?
a ÷ 7 = a/7
And what about Steve ?
a ÷ 9 = a/9
Where, a is the total area of the room.
So, let the time taken by both of them to paint the room together be 't'
So,
t(a/7 + a/9) = a
t(9a/63 + 7a/63) = a
t(16a/63) = a
t = 63/16 ≈ 4 hr