1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
zalisa [80]
3 years ago
11

M=8;(-2,16) write an equation in slope intercept given the slope and a point on the link

Mathematics
1 answer:
VashaNatasha [74]3 years ago
6 0

Answer:

y = kx+b

Step-by-step explanation:

use dis

You might be interested in
Tens years equal one decade. how many years in 0.1 decade?
max2010maxim [7]

1 year.


Hope this helps!

8 0
4 years ago
(6a + 5b + 4c) + (–6c + 15b) + (–8a)
kenny6666 [7]

Answer:

-2a + 20b - 2c

Step-by-step explanation:

(6a + 5b + 4c) + (–6c + 15b) + (–8a) = 6a + 5b + 4c - 6c + 15b - 8a

                                                          = 6a - 8a + 5b + 15b + 4c - 6c

                                                          = -2a + 20b - 2c

6 0
3 years ago
IM IN NEED...BRAINLIEST!! What does a|b mean in mathematics?
Rudiy27

Answer: It is the area of the base

Step-by-step explanation:

"B" represents the area of the base so if the base is a square than a capital "B" means to find the area of the base (square). To find the area of a square it would be length x width.

5 0
4 years ago
Read 2 more answers
Please help see attachment.
kupik [55]
5. subtraction PoE

6. reflexive property

7. substitution

8. def. of congruent

I hope that is right and it helped.
5 0
3 years ago
The owner of a construction company would like to know if his current work teams can build room additions quicker than the time
frez [133]

Answer:

The claim that the current work teams can build room additions quicker than the time allotted for by the contract has strong statistical evidence.

Step-by-step explanation:

We have to test the hypothesis to prove the claim that the work team can build room additions quicker than the time allotted for by the contract.

The null hypothesis is that the real time used is equal to the contract time. The alternative hypothesis is that the real time is less thant the allotted for by the contract.

H_0: \mu=0\\\\H_1: \mu

The significance level, as a storng evidence is needed, is α=0.01.

The estimated standard deviation is:

s_M=\frac{s}{\sqrt{n}}=\frac{0.2}{\sqrt{16}} =0.2/4=0.05

As the standard deviation is estimated, we use the t-statistic with (n-1)=15 degrees of freedom.

For a significance level of 0.01, right-tailed test, the critical value of t is t=2.603.

Then, we calculate the t-value for this sample:

t=\frac{x-\mu}{s_M} =\frac{-0.32-0}{0.05}= -6.4

As the t-statistic lies in the rejection region, the null hypothesis is rejected. The claim that the current work teams can build room additions quicker than the time allotted for by the contract has strong statistical evidence.

8 0
4 years ago
Other questions:
  • Find the circumcenter of triangle EFG with E(2, 6) F(2,4) and G)6,4
    13·2 answers
  • What 42as and improper fraction
    7·1 answer
  • I dont mind giving out 40 points to who ever answers this correctly
    8·1 answer
  • PLEASE ANSWER WILL MARK BRAINLIEST TO FIRST ANSWER.
    6·2 answers
  • Please help! I don’t know the answer
    13·1 answer
  • bob has 3 bookshelves that hold a total of 27 books. he adds a fourth shelf and now has 36 books. if he adds 2 more shelves ,how
    7·1 answer
  • At the fair a pack of 25 ride tickets cost $43.75.<br><br> What is the price per ticket?
    5·1 answer
  • Help with rational and irrational numbers.
    7·2 answers
  • BRAINLIST!!! DUE TODAY!!! PLEASE HELP!!!
    6·1 answer
  • Solve for x.<br><br> And show work
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!