Answer: The following is not considered when you are calculating cost of quality:<u><em> The cost of gaining formal acceptance of project deliverable.</em></u>
Cost of Quality contains all the costs that are both internal and external to the system; whereas, the Cost of Quality include the conformance, considering any costs connected with both appraisal and interference.
Cost of Quality is calculated as :
Cost of Quality = Cost of Poor Quality + Cost of Good Quality
Answer:
They were not allowed in advance of this investigation
Answer:
social media
Explanation:
social media is cheap and almost every one can access it . email will only reach fewer people
Answer:
<h2>
1. Calculate the activity rates for each cost pool assuming Schell uses an ABC system. </h2>
Material Handling = Cost Assigned to Pool/ (Quantity/Amount Consumed by Standard Floor Mat Line / Quantity/Amount Consumed by Deluxe Floor Mat Line)
= 3,750/( 30 +70)
= $37.50 material move
Quality Control = 13,860/ ( 400 + 600)
= $13.86 per inspection
Maintenance = 21,450/ (4,150 + 3,000)
= $3 per machine hour
<h2>
2. Calculate the amount of overhead that Schell will assign to the Standard floor mat line.</h2>
= Material handling + Quality Control + Maintenance
= (37.5 * 30) + (13.86 * 400) + (3 * 4,150)
= $19,119
<h2>
3. Determine the amount of overhead Schell will assign to the Deluxe product line.
</h2>
= Material handling + Quality Control + Maintenance
= (37.5 * 70) + (13.86 * 600) + (3 * 3,000)
= $19,941