Answer: The probability that the project will be completed in 33 days or less is equal to<u> </u><u>0.73</u> .
Step-by-step explanation:
We assume that this is a normally distribution.
Given : The critical path length is 30 days .
i.e. Population mean = 
Variance : 
Then, standard deviation : 
Z-score : 
The value of z corresponding to 33 = 
Now, the p-value = 
Hence, the probability that the project will be completed in 33 days or less is equal to 0.73.
Answer:
A & B
Step-by-step explanation:
<em><u>Question:</u></em>
Find the perimeter of the quadrilateral. if x = 2 the perimeter is ___ inched.
The complete figure of this question is attached below
<em><u>Answer:</u></em>
<h3>The perimeter of the quadrilateral is 129 inches</h3>
<em><u>Solution:</u></em>
The complete figure of this question is attached below
Given that, a quadrilateral with,
Side lengths are:

The values of the side lengths when x = 2 are

Perimeter of a quadrilateral = Sum of its sides
Perimeter of given quadrilateral = 32 + 22 + 44 + 31 = 129 inches
Thus perimeter of the quadrilateral is 129 inches
Answer:
Step-by-step explanation:
the first one
To find an area of a rectangle, we use this method: A = lw (length x width)
We need to replace a(rea) with 48.
48 = lw.
The following expressions can be used:
1 x 48.
2 x 24.
3 x 16.
4 x 12.
6 x 8.
8 x 6.
12 x 4.
16 x 3.
24 x 2.
48 x 1.