A and B lie on the line, yes, but what specifically are you supposed to do? Looks like your problem statement was cut off before you'd finished typing it in.
You say your line passes thru (-2,5) and has a slope of 2/3? Then, using the point-slope formula,
y-5 = (2/3)(x+2) This is the general equation for your line.
Now let's play around with B(-2,y). Suppose we subst. the x-coordinate of B, which is -2, into the equation y-5 = (2/3)(x+2); we get y-5 = (2/3)(-2+2) = 0. This tells us that y must be 5. But we already knew that!!
So, please review the original problems with its instructions and this discussion and tell me what you need to know from this point on.
Using the normal distribution, there is a 0.4826 = 48.26% probability that the sample mean is between 15 and 16 grams per day.
<h3>Normal Probability Distribution</h3>
The z-score of a measure X of a normally distributed variable with mean
and standard deviation
is given by:

- The z-score measures how many standard deviations the measure is above or below the mean.
- Looking at the z-score table, the p-value associated with this z-score is found, which is the percentile of X.
- By the Central Limit Theorem, the sampling distribution of sample means of size n has standard deviation
.
For this problem, the parameters are given as follows:

The probability is the <u>p-value of Z when X = 16 subtracted by the p-value of Z when X = 15</u>, hence:
X = 16:

By the Central Limit Theorem


Z = 2.11
Z = 2.11 has a p-value of 0.9826.
X = 15:


Z = 0
Z = 0 has a p-value of 0.5.
0.9826 - 0.5 = 0.4826 = 48.26% probability that the sample mean is between 15 and 16 grams per day.
More can be learned about the normal distribution at brainly.com/question/15181104
#SPJ1
Answer:x=8
Step-by-step explanation: