Answer:
Step-by-step explanation:
- Mass = Density*Volume
- V = m/d
- V = 378.24/2.76 = 137.04 cm³ (rounded)
Answer:
the y coordinate is 5
Step-by-step explanation:
In the figure attached, the directed line segment is shown.
J is located at (-3, 1) and K is located at (-8, 11)
run: x2 -x1 = -8 - (-3) = -5
rise: y2 - y1 = 11 - 1 = 10
Taking J as reference, the coordinate of the point that divides the directed line segment from J to k into a ratio of 2:3 is:
c = 2/(2+3) = 0.4
(x1 + c*run, y1 + c*rise)
(-3 + 0.4*-5, 1+0.4*10)
(-5, 5)
Answer:
72 kg
Step-by-step explanation:
For concreatting a tower cement, sand, stones are in the ratio 1:2:4 For 144kg sand.. What amount of cement is required?
We are given the ratio
cement: sand:stones
= 1:2:4
The sum of proportion =
1 + 2 + 4 = 7
We are given the kg of sand = 144kg
Step 1
We find the total kg of cement, sand and stones = x
Using the proportion of sand,
2/7 of x = 144kg
2/7 × x = 144kg
2x/7 = 144kg
Cross Multiply
2x = 7 × 144kg
x = 7 × 144kg/2
x = 504kg
Therefore the total kg of cement, sand and stone = 504kg
Step 2
The amount of cement required is calculated as:
1/7 × 504 kg = 72 kg
Therefore, 72kg of cement is required.
Answer:
(0,5)
Step-by-step explanation:
D because it says you will be getting at least 4500 or more dollars by adding the adult and student tickets