Answer:
F=5449 N
Explanation:
Work done is a product of force and displacement ie
Work done, W, = Force*Displacement
Power, P, is Work done/Time
where P is power, W is work done, F is force, S is displacement and t is time
In this case, F is the frictional force. Converting the power from hp to W, we multiply by 746 hence P=746*168=125328 W
Since displacement/time is velocity, then
P=FV where V is velocity in m/s
Making F the subject
F=5449 N
Answer:
Explanation:
Energy of signal being radiated per second on all sides = 71 x 10³ J .
At a distance of 220 m it is spread over an area of 4 π x (220)² because it is spreading uniformly on all sides.
So energy crossing per unit area
=
= 11.67 x 10⁻² Wm⁻²s⁻¹.
This is the intensity of the signal.
At 2200 m this intensity will further reduce by 100 times
So there it becomes equal to
11.67 x 10⁻⁴ Wm⁻² s⁻¹.
No "might<span>". The amount of CO2 in the </span>atmosphere<span> HAS gone up since the start of industrialisation as the result of </span>burning fossil fuels<span>.</span>
Answer:
v = 478.26 km/h
Explanation:
The question is "find in km.h the speed of a tiger that runs 550 km in 69min"
Distance, d = 550 km
Time, t = 69 min = 1.15 h
We need to find the speed of the tiger. The speed of an object is equal to the total distance covered divided by time taken. So,
So, the speed of the tiger is 478.26 km/h.
Answer:
(a). The average daily demand of this subdivision is 2444.44 gallon/min.
(b). The design-demand used to design the distribution system is 2444.44 gallon/min.
Explanation:
Given that,
Area = 1100 acres
Number of house in 1 acres = 4
Per house water demand = 800 g/day/house
(a). We need to calculate the average daily demand of this subdivision
Using formula for average daily demand
The average daily demand of this subdivision is 2444.44 gallon/min.
(b). We need to calculate the design-demand used to design the distribution system
Using formula for the design-demand
Hence, (a). The average daily demand of this subdivision is 2444.44 gallon/min.
(b). The design-demand used to design the distribution system is 2444.44 gallon/min.