<span>We have to calculate the length of the missing side.
Use the Pythagorean theorem:


I think. Your answers to choice are wrong.
</span>
Answer:
D
Step-by-step explanation:
Remember that the formula for the area of a rectangle is:

Where l is the our length and w is our width.
If we increase our length by 20%, this means that we add 20% or 0.2 of our old length to our old length. So, our new length will be:

Combine like terms:

Similarly, if we increase our width by 10%, this means that we add 10% or 0.1 of our old width to our old width. So, our new width is:

Combine like terms:

Therefore, our new area will be:

Substitute 1.2l and 1.1w. This yields:

Multiply:

Our old area is:

So, our area increased by a factor of 1.32.
This is the same as 32% of our old area.
So, our answer is D.
And we're done!
Answer: 22.5 yards
Step-by-step explanation:
There are a total of 20 parts yarn. This means that 3/20 of the carpet is silver. So in order to compare this to the 150 meters of total yarn, you would set up this equation:
3/20 = x/150
Next, you cross multiply:
3*150 = 20*x or simplified would be 450 = 20x
Next, you divide both sides by 20 to get x by itself.
450/20 = 22.5, so x is equal to 22.5
This means you have 22.5 yards of silver in the carpet.
Answer:
0.0623 ± ( 2.056 )( 0.0224 ) can be used to compute a 95% confidence interval for the slope of the population regression line of y on x
Step-by-step explanation:
Given the data in the question;
sample size n = 28
slope of the least squares regression line of y on x or sample estimate = 0.0623
standard error = 0.0224
95% confidence interval
level of significance ∝ = 1 - 95% = 1 - 0.95 = 0.05
degree of freedom df = n - 2 = 28 - 2 = 26
∴ the equation will be;
⇒ sample estimate ± ( t-test) ( standard error )
⇒ sample estimate ± (
) ( standard error )
⇒ sample estimate ± (
) ( standard error )
⇒ sample estimate ± (
) ( standard error )
{ from t table; (
) = 2.055529 = 2.056
so we substitute
⇒ 0.0623 ± ( 2.056 )( 0.0224 )
Therefore, 0.0623 ± ( 2.056 )( 0.0224 ) can be used to compute a 95% confidence interval for the slope of the population regression line of y on x
Answer:
x=10
Step-by-step explanation:
For number 19.
The equation you get is:
X+2=6(2) this is because 5x2=10, so you have to do the same here.
so, X+2=12
-2 from both sides and you get
x=10