hello your question is incomplete attached below is the complete question
A) overall mean = 5.535, standard deviation ≈ 0.3239
B ) upper limit = 5.85, lower limit = 5.0
C) Not all the samples meet the contract specifications
D) fluctuation ( unstable Asphalt content )
Explanation:
B) The daily average asphalt content has to obtained in order to determine the upper and lower control limits using an average asphalt content of 5.5% +/- 0.5% everyday
The upper limit : 14 may = ( 5.8 + 5.1 ) / 2 = 5.85
The lower limit : 16 may = ( 5.2 + 4.8 ) / 2 = 5.0
attached below is the required plot
C ) Not all the samples meet the contract specifications and the samples that do not meet up are samples from :
15 may and 16 may . this is because their Asphalt contents are 6.2 and 4.8 respectively and sample number 18 and 20
D ) what can be observed is that the ASPHALT content fluctuates between the dates while the contract specification is fixed
Answer:
The performance of the polymer is basically change by the various type of factors like shape, tensile strength and color.
The polymer based products are basically influenced by the environmental factors like light, acids or alkalis chemicals, salts and also heat.
The additives is one of the type of chemical polymer which basically include polymer matrix for improving the ability of processing of the polymer. It also helps to enhance the production and requirement of the polymer products in the environment.
15x -/c/ fb is the answer
<h2>
ANSWER</h2><h2>
</h2>
I had a couple of answers for this, but when I checked nothing
was right, so im not sure.
<h2>
</h2>