Im not really sure so ill just give it a try.
mayeb 70? ten less"
Answer:
The per hour rate is 0.5 inches per hour
Step-by-step explanation:
Here, we want to calculate the rate at which the level of the water increased
Mathematically, we can get this by dividing the amount of increment by the time it took
That would be 3 inches divided by 6 hours
= 3/6 = 0.5 inches per hour
Answer:
8
Step-by-step explanation:
Answer:

Step-by-step explanation:
Hello,
a and b are the zeros, we can say that

So we can say that

Now, we are looking for a polynomial where zeros are 2a+3b and 3a+2b
for instance we can write

and we can notice that
so
![(x-2a-3b)(x-3a-2b)=x^2-5(a+b)x+6[(a+b)2-2ab]+13ab\\= x^2-5(a+b)x+6(a+b)^2+ab](https://tex.z-dn.net/?f=%28x-2a-3b%29%28x-3a-2b%29%3Dx%5E2-5%28a%2Bb%29x%2B6%5B%28a%2Bb%292-2ab%5D%2B13ab%5C%5C%3D%20x%5E2-5%28a%2Bb%29x%2B6%28a%2Bb%29%5E2%2Bab)
it comes

multiply by 3
