Answer:
Position analysis questionnaire.
Explanation:
The position analysis questionnaire (PAQ) is a structured job analysis questionnaire that aids the user in conducting a quantified analysis of a given job. To complete a job analysis using the PAQ, the user reviews background information, observes the job, and conducts thorough interviews with job incumbents to determine job content then rates the extent to which each item on a standard list of PAQ job elements applies to that particular job. There are six types of rating scales used in the PAQ:
• Extent of Use;
• Importance to This Job;
• Amount of Time;
• Possibility of Occurrence;
• Applicability; and
• Item-Specific scales.
Answer:
TRUE
Explanation:
The integration of countries from the same region into a trade bloc has the purpose of free movement of goods and services among lower-priced member countries. This is because from integration, countries give up tariffs and customs barriers, allowing products to be marketed to everyone at a lower cost, aiming at the common good. If countries use the same currency, the benefits of integration are even greater as they eliminate currency conversion costs.An example of this type of integration is the European Union, where products move freely between member countries and are sold in the same currency, the euro.
Answer:
D. Zeta prevails, but only if the assignment is signed and in writing
Explanation:
Zeta prevails but only if the assignment is in writing and is signed.
If the assignment is express thereby and is signed by the parties in contract , then zeta can demand the amount from willy. Without any written consent and permission , willy cannot enforce the payment to zeta.
This is the best option in this case .
Answer: B. D) are not materially different from ethical principles in general.
Explanation:
Ethical Principles are Ethical Principles. It doesn't really matter what context they are being applied to for they are a standard thing with reference of course, to the society the business is based in. For this reason Business Ethics are not materially different from general ethics.
Business Ethics are usually a reflection of the norms and cultures of the society they are based in. Think of it like this, if a company is based in a certain place and adheres to principles that are different from what is considered ethical in that society, do you think that company will be very profitable? I think not. Business Ethics are therefore based on General ethics with an immaterial difference.