The pressure of water is 7.3851 kPa
<u>Explanation:</u>
Given data,
V = 150×

m = 1 Kg
= 2 MPa
= 40°C
The waters specific volume is calculated:
= V/m
Here, the waters specific volume at initial condition is
, the containers volume is V, waters mass is m.
= 150×
/1
= 0.15
/ Kg
The temperature from super heated water tables used in interpolation method between the lower and upper limit for the specific volume corresponds 0.15
/ Kg and 0.13
/ Kg.
= 350+(400-350) 
= 395.17°C
Hence, the initial temperature is 395.17°C.
The volume is constant in the rigid container.
=
= 0.15
/ Kg
In saturated water labels for
= 40°C.
= 0.001008
/ Kg
= 19.515
/ Kg
The final state is two phase region
<
<
.
In saturated water labels for
= 40°C.
=
= 7.3851 kPa
= 7.3851 kPa
Answer:

Explanation:
the half life of the given circuit is given by

where [/tex]\tau = RC[/tex]

Given 
resistance in the circuit is 40 ohm and to extend the half cycle we added new resister of 48 ohm. the net resitance is 40+48 = 88 ohms
now the new half life is

Divide equation 2 by 1


putting all value we get new half life


Answer:
ummm why is you doing this
Explanation:
It doesnt make sense.
The answer is choice C
Explanation:
As during construction ,the site is cleared for all debris before laying out the foundation. Even the sewer lines are dug out .
So it will be useful for the construction crews to connect the pipes to the sewer lines before the foundation is poured.
But usually the steps take in construction activity is:- first the site is cleared for the foundation to be poured and once the foundation wall is set , then all utilities , including plumbing and electrical activities are done.,
After this process is over, the city inspector comes to check whether the foundation has been laid down as per the code of construction.
Only after that the rest of the construction activity follows through.
Answer:
Electrical faults are also caused due to human errors such as selecting improper rating of equipment or devices, forgetting metallic or electrical conducting parts after servicing or maintenance, switching the circuit while it is under servicing, etc.
Explanation: