Lean systems coupled with statistical process control require a high degree of regimentation which in turn can lead to Worker stress.
<h3>What is statistical process control(spc) ?</h3>
Statistical process control is a system of quality control where statistical model, algorithm and and methods are used to monitor a process.
SPC is mainly practiced or implemented in two steps
- Initial setup or establishment of the process.
- production of the system /process
While other processes uses correction from results, SPC helps in early detection and solving of the problem.
Now using SPC requires a high degree of regimentation from Man, Machine, Material, Method, Environment. Now such high level of regimentation is not always effective on workers of a factory or system which in turn increase the worker stress.
To learn more about SPC:
brainly.com/question/14703158
#SPJ4