1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
lisabon 2012 [21]
3 years ago
7

Point A is at (2, -8) and point C is at (-4, 7).

Mathematics
1 answer:
Dahasolnce [82]3 years ago
7 0

Answer:

(-2, 2)

Step-by-step explanation:

<u>Given:</u>

  • Point A is at (2, -8) and point C is at (-4, 7)

<u>Difference of coordinates:</u>

  • Δx = 2 - (-4) = 6
  • Δy = - 8 - 7 = - 15

<u>The ratio of AB to AC is 2:1. So:</u>

  • AB = 2*AC/3 and BC = AC/3

<u>Then coordinates of point B should be 2/3 from the point A:</u>

  • x = 2- 6*2/3 = 2 - 4 = -2
  • y = - 8 - (-15)*2/3 = -8 + 10 = 2

So point B has coordinates of (-2, 2)

You might be interested in
If a 40-foot tree casts a 16-foot shadow, find the length of the shadow cast by a 24-foot tree
Mrrafil [7]

40/16 = 24/x

16*24 = 384

x = 384 / 40

x =9.6

 it cast a shadow 9.6 feet long

8 0
3 years ago
Need answer ASAP this assignment is due tomorrow
dmitriy555 [2]

Answer:

Venn diagrams, De'moivres rule and probability

Step-by-step explanation:

4 0
3 years ago
I NEED HELP ASAP with this Question PLEASE
alukav5142 [94]

Answer:

answer is b

Step-by-step explanation:

hope it helps!!!

7 0
3 years ago
Joe used a project management software package and has determined the following results for a given project.: Expected completio
statuscvo [17]

Answer:

0.1151 = 11.51% probability of completing the project over 20 days.

Step-by-step explanation:

Normal Probability Distribution

Problems of normal distributions can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the z-score of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.

Expected completion time of the project = 22 days.

Variance of project completion time = 2.77

This means that \mu = 22, \sigma = \sqrt{2.77}

What is the probability of completing the project over 20 days?

This is the p-value of Z when X = 20, so:

Z = \frac{X - \mu}{\sigma}

Z = \frac{20 - 22}{\sqrt{2.77}}

Z = -1.2

Z = -1.2 has a p-value of 0.1151.

0.1151 = 11.51% probability of completing the project over 20 days.

4 0
3 years ago
What is y−(−3y) help plzz
marysya [2.9K]
It will be y+3y and the answer is 4y
8 0
3 years ago
Read 2 more answers
Other questions:
  • The critical points of a rational inequality are x = –4 and x = 2. Which set of points can be tested to solve the inequality?
    8·2 answers
  • I am confused by this can someone help me, please!<br> Everything is on the photo.
    13·2 answers
  • Find each angle of a 24-sided regular polygon? Find each outer angle and sum of interior angle
    11·1 answer
  • Factor the polynomial function over the complex numbers?? <br><br><br><br> F(x)= x^4 -x^3-2x-4
    13·1 answer
  • A company makes concrete bricks that are shaped like rectangular prisms. Each brick is 5 inches long, 4 inches wide, and 2 inche
    13·1 answer
  • Order the ratios from least to greatest 6:3 13 to 4 19/2 15 to 10 8:2
    7·1 answer
  • Solve problem g(x) = -3x + 1
    12·1 answer
  • 33/35 in simplest form
    15·1 answer
  • PLSSS HURRY ILL GIVE YOU A BRAINLYEST
    8·1 answer
  • George monitors the number of influenza infections reported in a certain neighborhood in a given week. The recent numbers are sh
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!