Answer:
DESCULPA MAS EU NÃO ENTENDI
Answer:
The settlement that is expected is 1.043 meters.
Explanation:
Since the pre-consolidation stress of the layer is equal to the effective stress hence we conclude that the soil is normally consolidated soil
The settlement due to increase in the effective stress of a normally consolidated soil mass is given by the formula

where
'H' is the initial depth of the layer
is the Compression index
is the inital void ratio
is the initial effective stress at the depth
is the change in the effective stress at the given depth
Applying the given values we get

Answer:
a)
, b)
,
,
, c)
,
,
, 
Explanation:
a) The total number of users that can be accomodated in the system is:


b) The length of the side of each cell is:


Minimum time for traversing a cell is:



The maximum time for traversing a cell is:


The approximate time is giving by the average of minimum and maximum times:


c) The total number of users that can be accomodated in the system is:


The length of each side of the cell is:


Minimum time for traversing a cell is:



The maximum time for traversing a cell is:


The approximate time is giving by the average of minimum and maximum times:

