Answer:
828.7 hours.
Step-by-step explanation:
To answer a question in which the total time has to be calculated of all the activities, first of all, all the times have to be converted to a single form. There are two types: decimals and fractions. Convert the fractions into decimals.
Department A = 202.50 hours.
Department B = 212 3⁄4 hours = 212.75 hours.
Department C = 198.25 hours.
Department D = 215 1⁄5 hours = 215.20 hours.
Therefore, the total number of hours spent on this project by all four departments. is the sum of all the above numbers. 202.50 hours + 212.75 hours + 198.25 hours + 215.20 hours = 828.7 hours.
Therefore, the total time is 828.7 hours!!!
G equals 4, as side both sides by 2, then add three, and divide by four.
<h3>Answer:</h3>
x = 2
<h3>Explanation:</h3>
The rule for secants is that the product of segment lengths (on the same line) from the point of intersection to the points on the circle is a constant for any given point of intersection. Here, that means ...
... 3×(3+5) = 4×(4+x)
... 6 = 4+x . . . . divide by 4
... 2 = x . . . . . . subtract 4
_____
<em>Comment on this secant relationship</em>
Expressed in this way, the relationship is true whether the point of intersection is inside the circle or outside.
Hope this helps, 49ounces --> 49/20 *100 (sry for the bad handwriting)
Answer:
45 positive numbers have the sum of their digits equal to 8
Step-by-step explanation:
given data
number = 1 to 999
sum n = 8
to find out
positive numbers
solution
we will choose number by this formula
(n+1) (n+2) / 2
here n is 8
so put this value we get number that
positive numbers = (n+1) (n+2) / 2
positive numbers = (8+1) (8+2) / 2
positive numbers = 90 / 2
so 45 positive numbers have the sum of their digits equal to 8