1. We assume, that the number 92.4 is 100% - because it's the output value of the task.
<span>2. We assume, that x is the value we are looking for. </span>
<span>3. If 92.4 is 100%, so we can write it down as 92.4=100%. </span>
<span>4. We know, that x is 150% of the output value, so we can write it down as x=150%. </span>
5. Now we have two simple equations:
1) 92.4=100%
2) x=150%
where left sides of both of them have the same units, and both right sides have the same units, so we can do something like that:
92.4/x=100%/150%
6. Now we just have to solve the simple equation, and we will get the solution we are looking for.
7. Solution for what is 150% of 92.4
92.4/x=100/150
<span>(92.4/x)*x=(100/150)*x - </span>we multiply both sides of the equation by x
<span>92.4=0.666666666667*x - </span>we divide both sides of the equation by (0.666666666667) to get x
<span>92.4/0.666666666667=x </span>
<span>138.6=x </span>
x=138.6
<span>now we have: </span>
<span>150% of 92.4=138.6</span>
Assuming there is no specific percentages in the grade book, you would need a grade of 95 to get your whole grade to 90. You find this out by working backwards starting with 90 to find average. You take 90 times 2 which equals 180 and you subtract 85 from that to get 95! Brainliest?
Answer:
16 / C
Step-by-step explanation:
-4 x -4 = 16
4 x 4 = 16
two negatives cancel out when multiplying, that is why it equals 16*
Number of pallets moved in 4.5 hours = 108
converting 4.5 hours in minutes we get,
4*60 + 0.5*60 = 240+30 = 270 minutes
So, 108 pallets were moved in = 270 minutes
1 pallet was moved in =
minutes
As the tie will get over in 2 hours or 2*60 = 120 minutes, the number of pallets that can be moved will be =
pallets.
Hence, 48 pallets can be moved before quitting time.
Answer:
25/64
Step-by-step explanation:
do what's inside parentheses first
-3/8 - 2/8 = -5/8
-5/8(-5/8) = 25/64