Answer:
B. 2x2
Step-by-step explanation:
To match the number with the opposite, we are flipping the sign. If the sign is originally a negative, it would become a positive, and vice versa.
Term: 3.2 Match (Opposite): B) - 3.2
Term: -2.3 Match (Opposite): D) 2.3
Term: -1.5 Match (Opposite): C) 1.5
Term: 5.1 Match (Opposite): A) -5.1
~
Answer:
$41.16
Step-by-step explanation:
Length of bricks required = 35 feet, length of brick sold = 10 inches, cost of 10 inches brick = $0.98 per brick
Total number of brick required to build the back yard = Length of bricks required ÷ Length of brick sold
1 ft = 12 inches
Number of brick required = (35 * 12) ÷ 10
Number of bricks required = 42 bricks
Cost of brick required = Per length cost of brick * Number of bricks required
Cost of brick required = 0.98 * 42
Cost of brick required = $41.16
Ms. Fontanges would spend $41.16 on the purchase of bricks
Answer:
This question is asking you to find the ending position of a shape (particle) that is moving horizontally along the horizontal axis by finding its velocity with the equation shown. When t=0, the shape is 4 units to the left of the vertical axis, so it wants you to find where on the horizontal axis the shape is when t = 8. Hope this helped!!!
Answer:
The unit rate is<u> 1.25 seconds per jump</u>.
Step-by-step explanation:
Given:
Will can jump rope at a rate of 8 jumps for every 10 seconds.
Now, to find the unit rate:
So, by dividing we get the unit rate.
At the rate of 8 jumps Will takes 10 seconds.
Thus, for the rate of 1 jump he will take = 
Therefore, the unit rate is 1.25 seconds per jump.