If you divide 68.5 km/h by 60 (the minutes in an hour) and then you get 1.141 then you multiply it by 5.45 and you get 6.222!
Your Answer is 6.222!!!!
Answer:
W=16.58J
Explanation:
initial information we have
work: 
stretched distance: 
from this, we can find the value of the constant of the spring k, with the equation for work in a spring:

substituting known values:

and clearing for k:

and now we want to know how much work is done when we stretch the spring a distance of 6.5cm from equilibrium, so now x is:

and using the same formula for work, with the value of k that we just found:


Answer:
For a velocity versus time graph how do you know what the velocity is at a certain time?
Ans: By drawing a line parallel to the y axis (Velocity axis) and perpendicular to the co-ordinate of the Time on the x axis (Time Axis). The point on the slope of the graph where this line intersects, will be the desired velocity at the certain time.
_____________________________________________________
How do you know the acceleration at a certain time?

Hence,
By dividing the difference of the Final and Initial Velocity by the Time Taken, we could find the acceleration.
_________________________________________________________
How do you know the Displacement at a certain time?
Ans: As Displacement equals to the area enclosed by the slope of the Velocity-Time Graph, By finding the area under the slope till the perpendicular at the desired time, we find the Displacement.
_________________________________________________________
Given:
u = 6.5 m/s, initial velocity
a = 1.5 m/s², acceleration
s = 100.0 m, displacement
Let v = the velocity attained after the 100 m displacement.
Use the formula
v² = u² + 2as
v² = (6.5 m/s)² + 2*(1.5 m/s²)*(100 m) = 342.25 (m/s)²
v = 18.5 m/s
Answer: 18.5 m/s