Answer:
$109.71
Step-by-step explanation:
first we find the perimeter
=2(280+200)
=2×480
=960m
now we multiply it by 4 as he wants it 4 times around
960×4
3840
now we find the fencing cost
since 35 per meter we divide it by 35
3840/35
=$<u>109.71</u>
Answer:
positive
Step-by-step explanation:
negative slopes go from right to left; this line goes from left to right
0; the line isn't completely horizontal
undefined; the line isn't completely vertical
The quadratic equation in its generic form is:
ax2 + bx + c
To complete squares we must add the following term:
(b / 2) ^ 2
The equation is:
ax2 + bx + c + (b / 2) ^ 2
We have the following equation:
x ^ 2 - 5x + k = 7
By completing squares we have:
x ^ 2 - 5x + (-5/2) ^ 2 = 7 + (-5/2) ^ 2
Rewriting:
x ^ 2 - 5x + 6.25 = 7 + 6.25
Answer:
A constant term should be used to complete the square is:
6.25
Answer: Option <span>C. To get system B, the second equation in system A was replaced by the sum of that equation and the first equation multiplied by -3. The solution to system B will be the same as the solution to system A.
First equation of system A multiplied by -3:
(-3)(x+6y=5)
(-3)(x)+(-3)(6)=(-3)(5)
-3x-18=-15
Sum of the second equation of system A and the first equation multiplied by -3:
(-3x-18)+(3x-7y)=(-15)+(-35)
-3x-18+3x-7y=-15-35
-25y=-50
System B
x+6y=5
-25y=-50 </span>