Answer: Ammeters have a very low resistance and are placed in series with a resistor.
Ammeters have a very low resistance so as to not significantly alter the total resistance of a circuit.
Voltmeters have a relatively high resistance and are placed in parallel with a resistor.
Explanation: An ammeter is a device which used to measure current in a circuit. Thus, it is placed in series with the other components of the circuit. In series, the current remains same throughout the circuit and depends on the net resistance of the circuit.
This, the ammeter must have very low resistance so that it doesn't alter the net resistance of the circuit.
A voltmeter is a device which is used to measure potential drop across a component in a circuit. Thus, it is placed in parallel combination to to the component. The resistance of a voltmeter must be high so that no current flows through it and alters the potential drop across the component.
Answer:
The order is Star 3 < Star 2 < Star 1 < Star 4
Explanation:
Lets name the stars with their written order.
Star 1: 2.7 x 10^18 km3
Star 2: 6.9 x 10^12 km3
Star 3: 2.2 x 10^12 km3
Star 4: 4.9 x 10^21 km3
Star with lowest power of 10 has the least volume. Therefore, star 2 and star 3 would be the stars with least volume. Star 2's coefficient is better than Star 3. Thus, the order will be Star 3 < Star 2 < Star 1 < Star 4.
Answer:
Electrons will start moving faster in the circuit
The answer would be D
Because there are the same amount of elements on each side (3Mg on the left and 3 Mg on the right. Then 2 N on the left and 2 N on the right also)
Answer:
work done lifting the bucket (sand and rope) to the top of the building,
W=67.46 Nm
Explanation:
in this question we have given
mass of bucket=20kg
mass of rope=
height of building= 15 meter
We have to find the work done lifting the bucket (sand and rope) to the building =work done in lifting the rope + work done in lifting the sand
work done in lifting the rope is given as,
=
..............(1)
=
=22.5 Nm
work done in lifting the sand is given as,
.................(2)
Here,
F=mx+c
here,
c=20-18
c=2
m=
m=.133
Therefore,

Put value of F in equation 2


Therefore,
work done lifting the bucket (sand and rope) to the top of the building,
W=22.5 Nm+44.96 Nm
W=67.46 Nm