The square root of 80 can be broken up into the square root of 16 x square root of 5. We know that the square root of 16 is 4. So in the form (a sqrt b)
A would be 4 and b would be 5.
Answer: 4 sqrt 5
Answer:
I believe the awnser is 3
Set up the equation so m<HCB + m<DCH = m<DCB
2x + 100 + 60 = x + 170
2x+ 160 = x +170
-x -x
x + 160 = 170
- 160 -160
x = 10
Answer:

Step-by-step explanation:
Z - score
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

Calculate the Z value for the next car that passes through the checkpoint will be traveling slower than 65 miles per hour.
This is Z when X = 65. So



Answer:
Step-by-step explanation:
Answer: Choice A) Rectangle B'C'D'E' is larger because scale factor is greater than 1.
Going from (x,y) to (3x,3y) means we multiply each coordinate by 3. This is the scale factor. The scale factor being larger than 1 means the new image is an enlargement compared to the original preimage. Specifically the dimensions of the new rectangle are 3 times larger.