Answer:
Those products are generally called Work in Process WIP
Explanation:
Work in process (WIP), or work in progress (WIP), goods in process, or in-process inventory in a manufacturing industry/company refer to the company's partially finished goods waiting for completion and eventual sale or the value of these items.
These items are either just being produced or require further processing (like purification, separation, packaging or handling) in a queue or a buffer storage.
Answer:
to be or not to be
Explanation:
Vivi is a drummer for a band. She burns 756756756 calories while drumming for 333 hours. She burns the same number of calories each hour.
Answer:
<h2>the answer of sols brother is correct</h2><h3>hope it helps you have a good day</h3><h2 />
Answer:
Q= 4.6 × 10⁻³ m³/s
actual velocity will be equal to 8.39 m/s
Explanation:
density of fluid = 900 kg/m³
d₁ = 0.025 m
d₂ = 0.05 m
Δ P = -40 k N/m²
C v = 0.89
using energy equation

under ideal condition v₁² = 0
v₂² = 88.88
v₂ = 9.43 m/s
hence discharge at downstream will be
Q = Av
Q =
Q =
Q= 4.6 × 10⁻³ m³/s
we know that

hence , actual velocity will be equal to 8.39 m/s
The total number of trips that the vehicle has to make based on the given sequence of operation is 120 trips.
<em>"Your</em><em> </em><em>question is not complete, it seems to be missing the following information;"</em>
The sequence of operation is A - E - D - C - B - A - F
The given parameters;
- <em>number of pieces that will flow from the first machine A to machine F, = 2,000 pieces</em>
- <em>initial unit load specified in the first machine, L₁ = 50</em>
- <em>final unit load, L₂ = 100 </em>
- <em>the capacity of the vehicle = 1 unit load</em>
<em />
The given sequence of operation of the vehicle;
A - E - D - C - B - A - F
<em>the vehicle makes </em><em>6 trips</em><em> for </em><em>100</em><em> unit </em><em>loads</em>
The total number of trips that the vehicle has to make, in order to transport the 2000 pieces of the load given, is calculated as follows.
100 unit loads ----------------- 6 trips
2000 unit loads --------------- ?

Thus, the total number of trips that the vehicle has to make based on the given sequence of operation is 120 trips.
Learn more here:brainly.com/question/21468592