<span><span>PART A) the initial value of the function is 150 at 0 weeks, that means that there are still 150 songs to be downloaded at the beginning.
</span> The rate of change is -30 songs each week, that is because the amount of songs left to be downloaded decrease by 30 each week.</span>
<span><span>PART B:
</span><span> lets use 2 points of the graph p1(0, 150), p2(1, 120)
calculate the slope:
m = (y2- y1)/(x2 - x1) = (120 - 150)/(1 - 0)
m = -30
and now use line equation in form point-slope:
y - y1 = m(x - x1)
y - 150 = -30(x - 0)
y = -30x + 150</span></span>
where C is the circumference, d is the diameter and r is the radius.
The diameter of a circle is a line segment that passes through the center of the circle and has its endpoints on the circle. The radius of the circle is a line segment from the center of the circle to a point on the circle. The diameter of a circle is twice the length of its radius.
If you are given the diameter then use the formula C = πd
If you are given the radius then use the formula C = 2πr
Step-by-step explanation:
4 Is the answer since 4 is x 4+4 is 8 8-4 is 4 :)
Answer:
The productivity is measured in cubic meters per kilogram.
Step-by-step explanation:
For the formula for the productivity
of the camel

where
is the area of the hump and is measured in square meters,
is the distance the camel can travel (measure in meters), and
is the mass of the camel (measured in kilograms
).
Then, the productivity of the camel is measure in


cubic meters per kilogram.