Answer: A)
Step-by-step explanation: If You just look at the numbers you can single out which one is correct
20t +15t+90+25t-75=60t+15
60t+15/3=20t+5 as the average
☺☺☺☺
1. x=5/2
2. x=3/4-3/4y
y belongs R
300 x 0.02 x 5 = 30
answer
<span> interest will $30 in the first 5 years</span>
Answer:
$3.42
Step-by-step explanation:
Meters of material required = 1.2 meters
Cost per meter of material = $0.85
Direct labor hours = 0.1
Cost of direct labor per hour = $15
Overhead rate = $9 per direct labor hour
Standard cost per unit of product :
(Direct material cost per unit + direct labor cost per unit + overhead cost per unit)
Direct material cost per unit :
Material needed × cost per meter = (1.2 × $0.85) = $1.02
Direct labor cost per unit :
Direct labor hour × cost per hour = ( 0.1 × $15) = $1.5
Overhead cost:
0.1 * $9 = $0.9
Standard cost :
($1.02 + $1.5 + $0.9) = $3.42