Answer:
See attachment
Step-by-step explanation:
In other to draw a mapping diagram for the ordered pairs (1,0) (3,0) (5,4) (7,4) (9,4).
We identify the domain and range:
The domain is the set of the first coordinates of the ordered pairs.
Domain={1,3,5,7,9}
The range is the set of all the second coordinates.
Range: {0,4}
Answer:
20
Step-by-step explanation:
h(-7) just means that inside the x value, you replace the x with a -7.
h(-7) = |3x| - 1
h(-7) = | 3(-7)| - 1
h(-7) = | -21 | - 1
NOTE: -21 is inside |x|, those straight lines mean absolute value. No matter what, any negative number would turn into a positive one. And if it’s posititve, then it stays positive.
h(-7) = 21 - 1
h(-7) = 20
Answer:
1641.36 is how much he will pay for that stuff in one year
Step-by-step explanation:
$1641.36
10.68 each for the 2 same length sides. The total of the 5 sides is 45.56 less the 3 sides which total 24.2 leaves 21.36 remaining for the 2 equal length sides. So divide 21.36 by 2 = 10.68
(45.56 - 24.2)/2 = 10.68
Answer:
1.649 approximately 2
Step-by-step explanation:
S.d = standard deviation = 0.5
Time taken = lead time = 2 weeks
Mean = demand for week = 5 boxes
We are required to find the safety stock to maintain at 99% service level.
At 99% level, the Z value is equal to 2.326.
Therefore,
Safety stock = z × s.d × √Lt
= 2.326 × 0.5 x √2
= 1.649
Which is approximately 2.