1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Nataly_w [17]
3 years ago
15

A construction company is repaving a damaged road. So far, they have repaved a total of 97,338 inches of the road. Today, they r

epaved 29,092 inches of the road. How many inches of the road had they repaved before today?
Mathematics
1 answer:
borishaifa [10]3 years ago
3 0

68,246 inches of road had been repaved before today.

Step-by-step explanation:

Given,

Length of road repaved so far = 97338 inches

Length repaved today = 29092 inches

Length repaved before today = Total length repaved - Length repaved today

Length repaved before today = 97338 - 29092

Length repaved before today = 68246 inches

68,246 inches of road had been repaved before today.

Keywords: subtraction

Learn more about subtraction at:

  • brainly.com/question/1096947
  • brainly.com/question/11018983

#LearnwithBrainly

You might be interested in
Assume that P(E) = 0.471 and P(F) = 0.595. If E and F are independent, find P(E and F)
dsp73

The value of the probability P(E and F) is 0.2802

<h3>Independent probability</h3>

Events are known to be independent if the occurrence of one does not affect the other.

Given the following parameters

P (E) =0.471

P(F) = 0.595

If E and F are independent, then;

P(E and F) = P(E)P(F)

P(E and F)  = 0.471 * 0.595
P(E and F)  = 0.2802

Hence the value of the probability P(E and F) is 0.2802

Learn more on independent events here: brainly.com/question/1374659

#SPJ1

8 0
2 years ago
PLEASE ANSWER ASAP!! WILL GIVE 50 POINTS! AND BRAINLIST!
levacccp [35]

\frac{3}{5}  -  \frac{1}{4}  =  \frac{7}{20}
then
\frac{7}{20}  \div  \frac{7}{10}  =  \frac{1}{2}
4 0
3 years ago
Find rate of change help show work.
sukhopar [10]

Answer:

rise/run = 2/-4 or it is rise/run = -2/4

3 0
2 years ago
Let L be the line parametrized by x = 2 + 2t, y = 3t, z = −1 − t. (a) Find a linear equation for the plane that is perpendicular
Elden [556K]

Answer:

Step-by-step explanation:

Given that L is a line parametrized by

x = 2 + 2t, y = 3t, z = −1 − t

The plane perpendicular to the line will have normal as this line and hence direction ratios of normal would be coefficient of t in x,y,z

i.e. (2,3,-1)

So equation of the plane would be of the form

2x+3y-z =K

Use the fact that the plane passes through (2,0,-1) and hence this point will satisfy this equation.

2(2)+3(0)-(-1) =K\\K =5

So equation is

2x+3y-z =5

b) Substitute general point of L in the plane to find the intersecting point

2(2+2t)+3t-(-1-t) =5\\4+8t+1=5\\8t=0\\t=0\\(x,y,z) = (2,0,-1)

i.e. same point given.

3 0
3 years ago
Larry bought a used boat for $2400 and sold it for 2000 two years later what was the percent of decrease
guajiro [1.7K]
It pretty much would be 400
3 0
3 years ago
Other questions:
  • which of the following equation of the line in the standard XY coordinate plane passes through 2, -3 and has a slope of negative
    11·1 answer
  • A round trip in a helicopter lasted 4 1/2 hours. The average rate going was 160 kilometers per hour. the average rate returning
    14·1 answer
  • Explain how to do this
    12·1 answer
  • Mini muffins cost $3:00 per dozen Andre says I have $2:00 so I can afford 8 muffins Elena says I want to get 16 muffins so I’ll
    10·1 answer
  • The perimeter of a rectangle can be found using the equation P = 2L + 2W, where P is the perimeter, L is the length, and W is th
    10·2 answers
  • Is this right? pls help asapppp
    8·2 answers
  • Can anyone help me choose the correct answer?!
    10·1 answer
  • What is the average rate of change for this quadratic function for the interval from x = 0 to x = 2?
    11·1 answer
  • Please could someone correct this question and give me the explanation and example please
    15·1 answer
  • Consider a sample with data values of 26, 27, 20, 15, 30, 34, 28, and 20. Compute the range, interquartile range, variance, and
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!