zepelin [54]
3 years ago
15

It is not a practical proposition to take direct measurements in nanoscale, but we can estimate variations in position and momen

tum of particles by a)-Scanning Electron Microscopes b)-Transmission Electron Microscope c)-Heisenberg Uncertainly Principle d)- None of the above
Engineering
1 answer:
Volgvan3 years ago
7 0

Answer:

Answer is c Heisenberg's uncertainty principle

Explanation:

According to Heisenberg's uncertainty principle there is always an inherent uncertainty in measuring the position and momentum of a particle simultaneously.

Mathematically

\Delta x\times \Delta \overrightarrow{p}\geq \frac{h}{4\pi }

here 'h' is planck's constant

You might be interested in
Chọn dữ liệu phù hợp và biểu diễn chúng dưới dạng biểu đồ, từ đó cho biết 3 yếu tố
frutty [35]

Answer:

Please explain it in English so that i can help you or you need someone who can speak Vietnam help you

5 0
3 years ago
Tech A says you can find the typical angle of a V-block engine by dividing the number of cylinders by 720
Lady_Fox [76]

Answer:

Tech A is correct

Explanation:

Tech A is right as its V- angle is identified by splitting the No by 720 °. Of the piston at the edge of the piston.

Tech B is incorrect, as the V-Angle will be 720/10 = 72 for the V-10 motor, and he says 60 °.

8 0
3 years ago
A vacuum gage connected to a tank reads 30 kPa at a location where the barometric reading is 755 mmHg. Determine the absolute pr
navik [9.2K]

Answer:

Absolute pressure=70.72 KPa

Explanation:

Given that Vacuum gauge pressure= 30 KPa

Barometer reading =755 mm Hg

We know that barometer always reads atmospheric pressure at given situation.So  atmospheric pressure is equal to  755 mm Hg.

We know that P= ρ g h

Density of Hg=13600 \frac{kg}{m^3}

So P=13600 x 9.81 x 0.755

P=100.72 KPa

We know that

Absolute pressure=atmospheric pressure + gauge pressure

But here given that 30 KPa is a Vacuum pressure ,so we will take it as negative.

Absolute pressure=atmospheric pressure + gauge pressure

Absolute pressure=100.72 - 30   KPa

So

Absolute pressure=70.72 KPa

8 0
3 years ago
Three tool materials (high-speed steel, cemented carbide, and ceramic) are to be compared for the same turning operation on a ba
Tpy6a [65]

Answer:

Among all three tools, the ceramic tool is taking the least time for the production of a batch, however, machining from the HSS tool is taking the highest time.

Explanation:

The optimum cutting speed for the minimum cost

V_{opt}= \frac{C}{\left[\left(T_c+\frac{C_e}{C_m}\right)\left(\frac{1}{n}-1\right)\right]^n}\;\cdots(i)

Where,

C,n = Taylor equation parameters

T_h =Tool changing time in minutes

C_e=Cost per grinding per edge

C_m= Machine and operator cost per minute

On comparing with the Taylor equation VT^n=C,

Tool life,

T= \left[ \left(T_t+\frac{C_e}{C_m}\right)\left(\frac{1}{n}-1\right)\right]}\;\cdots(ii)

Given that,  

Cost of operator and machine time=\$40/hr=\$0.667/min

Batch setting time = 2 hr

Part handling time: T_h=2.5 min

Part diameter: D=73 mm =73\times 10^{-3} m

Part length: l=250 mm=250\times 10^{-3} m

Feed: f=0.30 mm/rev= 0.3\times 10^{-3} m/rev

Depth of cut: d=3.5 mm

For the HSS tool:

Tool cost is $20 and it can be ground and reground 15 times and the grinding= $2/grind.

So, C_e= \$20/15+2=\$3.33/edge

Tool changing time, T_t=3 min.

C= 80 m/min

n=0.130

(a) From equation (i), cutting speed for the minimum cost:

V_{opt}= \frac {80}{\left[ \left(3+\frac{3.33}{0.667}\right)\left(\frac{1}{0.13}-1\right)\right]^{0.13}}

\Rightarrow 47.7 m/min

(b) From equation (ii), the tool life,

T=\left(3+\frac{3.33}{0.667}\right)\left(\frac{1}{0.13}-1\right)\right]}

\Rightarrow T=53.4 min

(c) Cycle time: T_c=T_h+T_m+\frac{T_t}{n_p}

where,

T_m= Machining time for one part

n_p= Number of pieces cut in one tool life

T_m= \frac{l}{fN} min, where N=\frac{V_{opt}}{\pi D} is the rpm of the spindle.

\Rightarrow T_m= \frac{\pi D l}{fV_{opt}}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 47.7}=4.01 min/pc

So, the number of parts produced in one tool life

n_p=\frac {T}{T_m}

\Rightarrow n_p=\frac {53.4}{4.01}=13.3

Round it to the lower integer

\Rightarrow n_p=13

So, the cycle time

T_c=2.5+4.01+\frac{3}{13}=6.74 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times6.74+\frac{3.33}{13}=\$4.75/pc

(e) Total time to complete the batch= Sum of setup time and production time for one batch

=2\times60+ {50\times 6.74}{50}=457 min=7.62 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times4.01}{457}=0.4387=43.87\%

Now, for the cemented carbide tool:

Cost per edge,

C_e= \$8/6=\$1.33/edge

Tool changing time, T_t=1min

C= 650 m/min

n=0.30

(a) Cutting speed for the minimum cost:

V_{opt}= \frac {650}{\left[ \left(1+\frac{1.33}{0.667}\right)\left(\frac{1}{0.3}-1\right)\right]^{0.3}}=363m/min [from(i)]

(b) Tool life,

T=\left[ \left(1+\frac{1.33}{0.667}\right)\left(\frac{1}{0.3}-1\right)\right]=7min [from(ii)]

(c) Cycle time:

T_c=T_h+T_m+\frac{T_t}{n_p}

T_m= \frac{\pi D l}{fV_{opt}}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 363}=0.53min/pc

n_p=\frac {7}{0.53}=13.2

\Rightarrow n_p=13 [ nearest lower integer]

So, the cycle time

T_c=2.5+0.53+\frac{1}{13}=3.11 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times3.11+\frac{1.33}{13}=\$2.18/pc

(e) Total time to complete the batch=2\times60+ {50\times 3.11}{50}=275.5 min=4.59 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times0.53}{275.5}=0.0962=9.62\%

Similarly, for the ceramic tool:

C_e= \$10/6=\$1.67/edge

T_t-1min

C= 3500 m/min

n=0.6

(a) Cutting speed:

V_{opt}= \frac {3500}{\left[ \left(1+\frac{1.67}{0.667}\right)\left(\frac{1}{0.6}-1\right)\right]^{0.6}}

\Rightarrow V_{opt}=2105 m/min

(b) Tool life,

T=\left[ \left(1+\frac{1.67}{0.667}\right)\left(\frac{1}{0.6}-1\right)\right]=2.33 min

(c) Cycle time:

T_c=T_h+T_m+\frac{T_t}{n_p}

\Rightarrow T_m=\frac{\pi \times 73 \times 250\times 10^{-6}}{0.3\times 10^{-3}\times 2105}=0.091 min/pc

n_p=\frac {2.33}{0.091}=25.6

\Rightarrow n_p=25 pc/tool\; life

So,

T_c=2.5+0.091+\frac{1}{25}=2.63 min/pc

(d) Cost per production unit:

C_c= C_mT_c+\frac{C_e}{n_p}

\Rightarrow C_c=0.667\times2.63+\frac{1.67}{25}=$1.82/pc

(e) Total time to complete the batch

=2\times60+ {50\times 2.63}=251.5 min=4.19 hr.

(f) The proportion of time spent actually cutting metal

=\frac{50\times0.091}{251.5}=0.0181=1.81\%

3 0
4 years ago
A tank with some water in it begins to drain. The function v ( t ) = 46 − 3.5 t determines the volume of the water in the tank (
olchik [2.2K]

Answer with Explanation:

Part a)

The volume of water in the tank as a function of time is plotted in the below attached figure.

The vertical intercept of the graph is 46.

Part b)

The vertical intercept represents the volume of water that is initially present in the tank before draining begins.

Part c)

To find the time required to completely drain the tank we calculate the volume of the water in the tank to zero.

0=46-3.5t\\\\3.5=46\\\\\therefore t=\frac{46}{3.5}=13.143minutes

Part d)

The horizontal intercept represents the time it takes to empty the tank which as calculated above is 13.143 minutes.

7 0
4 years ago
Other questions:
  • Can someone please do this for me? I’m so behind on other work for different classes and this one is due today! please I’d appre
    11·1 answer
  • Whats the best used for Arch bridge
    11·1 answer
  • Prompt the user to enter five numbers, being five people's weights. Store the numbers in an array of doubles. Output the array's
    11·1 answer
  • Water of dynamic viscosity 1.12E-3 N*s/m2 flows in a pipe of 30 mm diameter. Calculate the largest flowrate for which laminar fl
    13·1 answer
  • In your opinion, what is the external opportunity cost of a successful biking company in a community
    7·1 answer
  • Describe how a cavity wall works and sketch its major construction features. What aspects of cavity wall construction are most c
    5·1 answer
  • How did engineers help to create a ceiling fan
    8·1 answer
  • PLEASE HELP ME RIGHT NOW!!
    11·1 answer
  • What is the name of the part of the expressway where cars can both enter and exit?
    15·1 answer
  • Which of the following situations best describes student engaged in active learning
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!