When the handler has reached the point of balance of the animal, they should stop walking so that they may move only one animal at a time. The point of balance for cattle that are being worked with in limited places such as races and chutes is often found at the animal's shoulder, as seen by the diagrams.
This is further explained below.
<h3>What is a chute?</h3>
Generally, Chutes are channels, planes, or passageways that are either vertical or slanted and through which things may be transported using only gravity.
In conclusion, When the handler has reached the point where the animal's point of balance has been crossed, they should stop walking so that they may move just one animal.
As seen in the illustrations, the point of balance for cattle being worked with in restricted spaces like races and chutes is often located at the animal's shoulder.
Read more about chute
brainly.com/question/10976905
#SPJ1
Answer:
The critical radius is -1.30 nm
Explanation:
Temperature for homogenous nucleation of copper, 
Melting point of copper, 
Latent heat of fusion, 
Surface free energy, 
Critical radius, r = ?
The formula for the critical radius is given by:



The critical radius is -1.30 nm
Answer:
All 3 principal stress
1. 56.301mpa
2. 28.07mpa
3. 0mpa
Maximum shear stress = 14.116mpa
Explanation:
di = 75 = 0.075
wall thickness = 0.1 = 0.0001
internal pressure pi = 150 kpa = 150 x 10³
torque t = 100 Nm
finding all values
∂1 = 150x10³x0.075/2x0,0001
= 0.5625 = 56.25mpa
∂2 = 150x10³x75/4x0.1
= 28.12mpa
T = 16x100/(πx75x10³)²
∂1,2 = 1/2[(56.25+28.12) ± √(56.25-28.12)² + 4(1.207)²]
= 1/2[84.37±√791.2969+5.827396]
= 1/2[84.37±28.33]
∂1 = 1/2[84.37+28.33]
= 56.301mpa
∂2 = 1/2[84.37-28.33]
= 28.07mpa
This is a 2 d diagram donut is analyzed in 2 direction.
So ∂3 = 0mpa
∂max = 56.301-28.07/2
= 14.116mpa
Answer:
Technician B
Explanation:
In simplistic terms, the "hot wire" connects the load device to the source of electrical energy. The ground wire provides the return path for current from the load device to the energy source. In many circuits, the "ground wire" is at, near, or defined as "ground" potential (the actual potential of the Earth).
Technician A seems to be confused. Technician B is more correct.
C because it’s professional