Each flow element requires a test gauge ---> 32*80 = $2560
Each flow element needs total of 6 feet of tubing ----> 32*6 = 192 ft
price per foot = 6/100 = $.06
-----> 192*.06 = $11.52
Each 3-ft length of tubing requires 2 connectors. ----> (192/3)*2 = 128
-----> 128*2.5 = $320
Total Cost = 2560 + 11.52 + 320 = $2891.52
Subtract from budget:
3000 - 2891.52 = $108.48
25 in total what do you mean
Answer:
9,000
Step-by-step explanation
You pay one 4th of your money on taxes. 36000/4 is 9,000.
Answer:
A's average speed is 100. I did this same thing and passed my grade.
1.
a.) 2q + 5r
2(7) + 5(-2)
14 - 10 = 4
b.) 3(p + 6) + q + r Plug in the numbers
3(5 + 6) + 7 - 2 Solve inside the parentheses first
3(11) + 7 - 2
33 + 5 = 38
2.
a.) m(3m + 4n)
2(3(2) + 4(3))
2(6 + 12)
2(18) = 36
b.) n²(m + p²)
(3)²(2 + (-5)²)
9(2 + 25)
9(27) = 243
c.) 3m(8 + n) + n²
3(2) (8 + 3) + 3²
6(11) + 9
66 + 9 = 75