1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
shutvik [7]
3 years ago
15

If a is the least common multiple of 12, 24, and 36, and b is the lowest prime number, what is the sum of a and b

Mathematics
1 answer:
omeli [17]3 years ago
6 0

Answer:

Step-by-step explanation:

12=2×2×3

24=2×2×3

36=2×2×3×3

L.C.M.=2×2×3×3=36

lowest prime number=2

sum=36+2=38

You might be interested in
I need help please.
pishuonlain [190]

Step-by-step explanation:

2(x - 7) = 3(x + 9)

2x - 14 = 3x + 27

2x - 3x = 27 + 14

-x = 41

x = - 41

7 0
3 years ago
Describe how to solve the inequality 3x+4<13 using algebra tiles
vladimir1956 [14]

The solution is x < 3.

Solution:

The given expression is 3x + 4 < 13.

To solve the given inequality.

3x + 4 < 13

Subtract 4 tiles on both sides of the inequality.

⇒ 3x + 4 – 4 < 13 – 4

⇒ 3x < 9

Divide by 3 tiles on both sides of the inequality.

⇒ \frac{3x}{3} =\frac{9}{3}

⇒ x < 3

Hence the solution is x < 3.

4 0
2 years ago
What is the quotient of 99 divided by 9081
Artist 52 [7]

Hello from MrBillDoesMath!

Answer:

11/ 1009   (.0109 approximately)

Discussion:

99/9081 =                               => as 9081 = 9 * 1009 = 3 * 3 * 1009

99/ ( 3 * 3 * 1009)  =

(99/(3*3)) * (1/1009) =

(99/9)  * (1/1009)  =

11/ 1009 =

.0109 approximately


Thank you,

MrB

6 0
3 years ago
Read 2 more answers
Candy and Tim share a paper route. It takes Candy 85 min to deliver all the papers, and it takes Tim 65 min. How long does it ta
RSB [31]

Answer:

The time required to finish the work by both candy and Tim working together = 36.83 minute

Step-by-step explanation:

Time taken by the candy to finish the work T_{1}= 85 min

Time taken by the Tim to finish the work T_{2}  = 65 min

Thus the time taken by both to finish the work = \frac{T_1 \times\ T_2}{T_1 + T_2}

Put the values of T_{1} and T_{2}  we get ,

                    T_{} = \frac{85 \times\ 65}{85 + 65}

                    T_{} = \frac{221}{6}

                    T_{} = 36.83 minute

Thus the time required to finish the work by both candy and Tim working together = 36.83 minute

3 0
3 years ago
Determine the domain and range of each function<br><br> f(x)=-|x|-2
Alinara [238K]
Find the domain by finding where the function is defined. The range is the set of values that correspond with the domain.

Domain: (- infinity, infinity)
Range: (- infinity, -2)
4 0
3 years ago
Other questions:
  • CosX sec^2X tanX - cosX tan^3X = sinX
    5·1 answer
  • Find the number a such that the line x = a divides the region bounded by the curves x = (y^2) − 1 and the y-axis into 2 regions
    11·1 answer
  • What about this one a tennis ball has a radius of 1.25 inches. The outside of a tennis ball is covered with felt. How many squar
    5·2 answers
  • The line graph shows a direct variation with a unit rate of 1.4. Two of the points the line passes through are (5, 7) and (10, 1
    7·2 answers
  • Draw counters. Show how 7 is 5 and 2
    6·2 answers
  • What is an equivalent expression to 5( x plus 3y)
    6·1 answer
  • PEMDAS means and what is for
    5·1 answer
  • Two rectangles are similar. The length and width of the first rectangle is 4 m by 5 m. The second rectangle is similar by a scal
    6·1 answer
  • Please help me? :\ :/
    8·1 answer
  • Help me please! I don't really understand
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!