Answer:
It will take 3.214 minutes.
Step-by-step explanation:
<em>It is given that, the conveyor belt transports 300 cans in 5 mins and the smaller belt transports 300 cans in 9 minutes.</em>
Thus , the speed of conveyor belt is,
= 
and of smaller belt is,
= 
Thus, when both are used together,
<em>conveyor belt will transport (60)(t) cans and smaller belt will transport
(t) cans per minute.</em>
Thus the equation becomes,

t = 
Answer:
4.6 miles for 5 days.
Step-by-step explanation:
37 - 14 = 23
23 divided by 5 = 4.6
Answer:
Fencing needed = 20.8 units
Step-by-step explanation:
From the figure attached,
Given: Triangle ABC with vertices A(0, 6), B(6, 5) and C(5, -1).
We have to find the length of fence required to cover the triangular garden.
Amount of fencing required = Perimeter of the triangular garden
Perimeter of the garden = AB + BC + AC
Formula to get the distance between A and B,
d = 
AB =
= 
BC =
= 
AC =
=
Perimeter = 
= 6.08 + 6.08 + 8.60
= 20.76
≈ 20.8 units
Therefore, amount of fencing required to cover the triangular park is 20.8 units.
Answer:
your answer to your question is an lb
Answer:
The equation of this line would be y = 11x - 48
Step-by-step explanation:
To get this equation, we first have to find the slope. We do that with the slope eqaution.
m(slope) = (y2 - y1)/(x2 - x1)
m = (-4 - 7)/(4 - 5)
m = -11/-1
m = 11
Now we can use this slope and either point in point-slope form to find the equation.
y - y1 = m(x - x1)
y - 7 = 11(x - 5)
y - 7 = 11x - 55
y = 11x - 48