It has to move through a distance over time.
Answer:
remove contamination; pollution ; test ground water and dirt .
Answer:
750W
Explanation:
40×10= 400N
work done= force × distance
=400 × 75
=30000 J
Power= work done/ time
= 30000 ÷ 40
= 750 W
Answer:
The final position made with the vertical is 2.77 m.
Explanation:
Given;
initial velocity of the ball, V = 17 m/s
angle of projection, θ = 30⁰
time of motion, t = 1.3 s
The vertical component of the velocity is calculated as;

The final position made with the vertical (Yf) after 1.3 seconds is calculated as;

Therefore, the final position made with the vertical is 2.77 m.