Answer:
Great job
Step-by-step explanation:
Answer:
R;2 B;1 P;
Step-by-step explanation:
R is red there are 2 reds
B is blue there are 1 blues
P is purple there are 1 purples
Answer:
The expected total amount of time in minutes the operator will spend on the calls each day is of 210 minutes.
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
n-values of a normal variable:
For the sum of a sample of n values, the mean is of
and the standard deviation is of 
Average 2.8 minutes
This means that 
75 calls each day.
This means that 
What is the expected total amount of time in minutes the operator will spend on the calls each day?

The expected total amount of time in minutes the operator will spend on the calls each day is of 210 minutes.
Answer:
m∠A = 139°
Step-by-step explanation:
First we must know that
Supplementary angles equal to 180 degree.
Since we know that supplementary angles equal to 180 degree we can solve now:
Putting m ∠A and m ∠ B together and put the = 180
( 7x - 15 ) + ( 2x - 3 ) = 180
Now solving for x:
( 7x - 15 ) + ( 2x - 3 ) = 180
9x - 18 = 180
9x - 18 + 18 = 180 + 18
9x = 198
9x/9 = 198/9
x = 22
Hence, Angle A will have a measure of 7x - 15 which means 7 × 22 -15 = 154 - 15 = 139°
m∠A = 139°
The measure of Angle B will be 2x - 3 = 2 • 22 - 3 = 44 - 3 = 41°
m∠ B = 41°
139 + 31= 180
<u><em>[RevyBreeze]</em></u>