The EMV - Ending Market Value is given as:
$2,400,000.
<h3>How is the EMV Arrived At?</h3>
The EMV is given as:
BMV x (i + r); Where
BMV is the Beginning Market Value; and
r is the interest rateor percentage given.
Hence the EMV = 2,000,000 x ( 1 + 20%)
= 2,000,000 x 1.2
= $ 2, 400,000.
It is to be noted that the BMV is the Beginning Market Value which is the value of an investment at the start of the business period.
Learn more about Market Value at:
brainly.com/question/1350233
Answer: Technical sales engineer
Explanation:
An analysis engineer makes use of data and other technical information in order for him or her to be able to analyze a project plan, and provide necessary solutions.
Technical sales engineers gives their clients the needed support and sales advice for their business to thrive. Technical sales engineers helps their clients in giving technical advices, answering queries, as well as introducing new products.
Design engineers are the engineers that study, and develop ideas that will be used for new products. Sometimes, they also modify systems used in production so that organizational performance can be improved.
Inspection engineers are the engineers that looks at infrastructures and identify the problems affecting them e.g oil pipelines, roads, bridges, etc so that accidents will be prevented.
Consulting engineer is an engineer that deals with the planning, and infrastructures. Their work benefits the society as a whole.
Based on the above explanation, the answer is technical sales engineer.
Answer:
The critical length of surface flaw = 6.176 mm
Explanation:
Given data-
Plane strain fracture toughness Kc = 29.6 MPa-m1/2
Yield Strength = 545 MPa
Design stress. =0.3 × yield strength
= 0.3 × 545
= 163.5 MPa
Dimensionless parameter. Y = 1.3
The critical length of surface flaw is given by
= 1/pi.(Plane strain fracture toughness /Dimensionless parameter× Design Stress)^2
Now putting values in above equation we get,
= 1/3.14( 29.6 / 1.3 × 163.5)^2
=6.176 × 10^-3 m
=6.176 mm
Answer:
a) 22.5number
b) 22.22 m length
Explanation:
Given data:
Bridge length = 500 m
width of bridge = 12 m
Maximum temperature = 40 degree C
minimum temperature = - 35 degree C
Maximum expansion can be determined as

where , \alpha is expansion coefficient
degree C
SO, 

number of minimum expansion joints is calculated as

b) length of each bridge